KitLog pro

Powered By Kitlog Pro v2.0

Flying Lead RV-14A
' style=
Date:  12-31-2018
Number of Hours:  2.20
Manual Reference:  10-25 to 10-27
Brief Description:  Aft Fuselage

My first electrical installation without instructions. Had a few problems with attaching molex connectors before routing wire through holes (which made it impossible to route the wires). I came up with a tracking method using colors on my electrical drawing diagram and so far it has been fun and interesting. I laid the wire for the Pitch and Yaw trim along with the Tail light and a 9 pin CPC. I'll finish the electrical in the tail section with the ELT wiring and then hold until final hook up at final assembly.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.