KitLog pro

Powered By Kitlog Pro v2.0

Flying Lead RV-14A
' style=
Date:  12-30-2018
Number of Hours:  3.80
Manual Reference:  10-21 to 10-24
Brief Description:  Aft Fuselage

Started installation of the rudder cables and cable exit fairings before then routing the pitot static system and starting the electrical installation from my electrical drawing diagram. Also installed the Garmin Yaw servo mount which actually went in quite easily. I will continue electrical installation and wait for the arrival of more wash primer to spot prime the backs of rivets and exposed metal before continuing with final installation of the Aft Fuselage back deck.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.