Finished riveting the skins to the inspar ribs of the howizontal stabilizer then spent quite a bit of time dimpling the Elevator components. Much of it was used to modify the tools to ensure clearence while dimpling. Had to shave metal from the squeezer in two placer to make the angles. Looks like everything got dimpled without any extraneous damage though. Also built the hanging devise for the horizontal stabilizer above the garage. Making room wherever possible
Will have a friend look everything over tomorrow and get an A&P out to provide a logbook signoff next week before I close in the stabilizer.