Assembled left and right elevator and match drilled all hole callouts. Machine countersunk the trailing edges and assembled / drilled the trim tab. Deburred all drilled holes. Skipped around a lot throughout the elevator section trying to do all the drilling and countersinking before priming. Will continue with countersinking before scuffing all parts and priming.