KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  7-5-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Seat belt and electrical

Today I spent some time sanding down the aft hardpoints for the seatbelts and making the forward hardpoints. Waiting on some stuff from Aircrafty Spruce so I can lay down some S glass strips and set the points in place. I also secured the positive bat passthrough and added the negative which doubles as a ground point for the airframe.
' style=

Aft hardpoints sanded down and re-drilled

Aft hardpoints sanded down and re-drilled

' style=

View of bat connections from inside the tunnel

View of bat connections from inside the tunnel

' style=

View of connections from the engine compartment

View of connections from the engine compartment

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.