KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  11-16-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  More FWF stuff

I had some time to kill today so I decided to mount the starter and the alternator. I can't set the alternator belt until I have the flywheel on for good and I wanted to leave it loose so I could swing it out of the way for the baffle work. I also picked up some friction tape this morning so I was able to secure the brake lines along the legs. I believe I can actually fill the brakes and finish those off at this point if I want. You may notice I'm appearing in the pics more than, well, ever, and it's because the DAR is going to want to see me doing the work. Problem is I have done 99% of this by myself so I'm the guy taking all the pictures. So I'm trying to remember to occasionally set the timer on the camera so I'm in some of the shots.
' style=

Brackets in place and safety wired

Brackets in place and safety wired

' style=

Alternator and starter mounted

Alternator and starter mounted

' style=

Securing the brake lines to the legs.

Securing the brake lines to the legs.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.