KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  6-3-2006
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Removed tape and riveted baggage door together.

Nothing much here. I removed all of the tape and put the inside skin on the baggage door. I also started to drill the holes for my conduit run.
' style=

Tape removed from the rivet lines on one of the seat pans.

Tape removed from the rivet lines on one of the seat pans.

' style=

Baggage door ready to be final riveted.

Baggage door ready to be final riveted.

' style=

Baggage door assembled.

Baggage door assembled.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.