Powered By Kitlog Pro v2.0
Michael's RV-10 Build Log
RV-10
Paint
6-3-2006
< Previous Log Entry
Next Log Entry >
Date:
6-3-2006
Number of Hours:
2.00
Manual Reference:
Brief Description:
Removed tape and riveted baggage door together.
Nothing much here. I removed all of the tape and put the inside skin on the baggage door. I also started to drill the holes for my conduit run.
Tape removed from the rivet lines on one of the seat pans.
Baggage door ready to be final riveted.
Baggage door assembled.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
489
1696
Ailerons
10
22
Avionics/Instruments
17
181
Avionics/Wire
17
181
Cowl
7
41
Elevators
12
50
Empennage Assembly
4
18
Engine
11
47
Fairings
15
34
Flaps
10
24
Fuel Tanks
16
46
Fuselage
183
502
Hat Shelf
8
16
Horizontal Stab
12
31
Interior
3
13
Inventory
11
24
Lighting
8
55
Lighting/Electrical
8
55
Miscellaneous
34
90
Paint
14
23
Prop
1
4
Rudder
10
18
Systems
12
29
Tail Cone
16
49
Vertical Stabilizer
8
16
Wing Leading Edge
8
27
Wing Ribs
4
18
Wing Skins
17
46
Wing Spars
5
25
Wings Assembly
8
11
Copyright © 2001-2024 Matronics. All Rights Reserved.