KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  1-29-2006
Number of Hours:  1.00
Manual Reference:  28
Brief Description:  Started to rivet fuselage sections together.

Instead of spending way too much time trying to figure out the easiest way to rivet the two halves together, I decided to just do it and hope it doesn't need to be manuvered into another angle. Amy has been busy working a lot so she hasn't had time to give me a hand with this section but I think it's not going to be that bad. If I could rivet 90% of the forward row by myself, it should go pretty quick. I am going to try and get this section done before my trip on Wednesday, shouldn't be a problem.
' style=

Forward wing bulkhead where the gear leg brackets attach require double-flush rivets.

Forward wing bulkhead where the gear leg brackets attach require double-flush rivets.

' style=

Another view showing that they are flush.

Another view showing that they are flush.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.