Powered By Kitlog Pro v2.0
Michael's RV-10 Build Log
RV-10
Fuselage
12-17-2008
< Previous Log Entry
Next Log Entry >
Date:
12-17-2008
Number of Hours:
1.50
Manual Reference:
Brief Description:
Some fiberglass and misc work
Nothing really to show for today but I spent some time doing some of the finish work on the cabin lid. I also spent some time looking at all the dfferent wires that will need to be run so I can start figuring that out.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
457
1464
Ailerons
10
22
Avionics/Instruments
13
130
Avionics/Wire
13
130
Elevators
12
50
Empennage Assembly
4
18
Engine
8
25
Fairings
13
21
Flaps
10
24
Fuel Tanks
16
46
Fuselage
179
485
Hat Shelf
8
16
Horizontal Stab
12
31
Inventory
11
24
Lighting
8
55
Lighting/Electrical
8
55
Miscellaneous
30
70
Paint
14
23
Rudder
10
18
Systems
12
29
Tail Cone
16
49
Vertical Stabilizer
8
16
Wing Leading Edge
8
27
Wing Ribs
4
18
Wing Skins
17
46
Wing Spars
5
25
Wings Assembly
8
11
Copyright © 2001-2020 Matronics. All Rights Reserved.