KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  7-1-2006
Number of Hours:  3.00
Manual Reference:  39
Brief Description:  Began fabrication of control tubes

Sorry, not a lot for pictures. This is old stuff anyway, been there done that. I started fabrication of the push pull tubes for the elevator. There are three seperate tubes going back to the elevator. One was made a ways back in the tailcone section where it connects to a bellcrank by the battery and the other two are the subject of todays work. Basically these two are connected together by an idler mid way through the fuse and are then changed from push pull to a torque tube in order to connect to the two control sticks. Just for giggles before I seal it up for good I put a business card in one of the tubes with the construction years. I thought about putting an old thumb drive in it with the build log and program but we live in a little too litigeous environment nowadays.
' style=

Push-pull tube with safety wire.

Push-pull tube with safety wire.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.