KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  6-10-2006
Number of Hours:  1.75
Manual Reference:  33
Brief Description:  More prep of bulkhead cover and panels.

On my last tech counselor visit, Martin recommended I add a couple of stiffners to the lower bulkhead cover. The factory cover was corregated and had built in stiffness, mine was just a sheet of aluminum and had the potential to oil can. So I added some stiffners and procedded to alodine and rivet them on. I also dis some more sound proofing on these additional components. Lastly I sprayed the little tab in the baggage floor so it matches now that it may be seen. Hopefully I will fininsh the baggage area and door tomorrow. I'm still waiting on my camlocs though.
' style=

Stiffners added.

Stiffners added.

' style=

Parts soundproofed.

Parts soundproofed.

' style=

The floor/skin attach tab now sprayed.  It will match once dried.

The floor/skin attach tab now sprayed. It will match once dried.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.