KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  6-23-2006
Number of Hours:  3.00
Manual Reference:  37
Brief Description:  Finished up the fuel system.

Got the fuel system done this morning. mocking everything up in that little space is a real PITA. You pretty much need to get everything cut and in place with the connections at least finger tight and then take it all out for final tightening. When you change the fuel filter you will probably have to take out the entire assembly. That operation isn't actually too bad though once everything is complete. I'm glade I went the Aeroquip hose route as it's much easier to deal with . If you decide to go with the hardlines you probably will want to order another 5-10 feet of line. Only takes being of by 1/16th inch and you have to chuck an entire section of line. And you will have a couple "practice" attempts.
' style=

Valve, fuel filter, fuel pump complex ready to reinstall.

Valve, fuel filter, fuel pump complex ready to reinstall.

' style=

Everything connected and in the tunnel.

Everything connected and in the tunnel.

' style=

Overhead view of the fuel system.

Overhead view of the fuel system.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.