KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  10-25-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Cabin top finish work

I wanted to try and get as much of the cabin top prepped for paint prior to putting it up on the gear just because it's easier to work on at ground level. I was able top "ice" the top and fill in the weave and some pinholes using Metal Glaze which worked rather well. But the temps are dropping which is causing the filler to take extended time to cure and it is gumming up the sanpaper so I guess I'll leave it now until spring. Time to give this girl some legs!
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.