KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  3-1-2024
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Throttle body work

One of the things that has been a PITA is the controls for the throttle and mixture. I've spent way too much time on different configurations to get something to work that didn't seem sketchy. I think I may finally have it and just need to print a new test panel that will hold the two cables in place to verify before cutting a new one. I may also resurrect the angled bushing but this time it will be used on the mixture cable. It's too thick to use in conjunction with a cable wedge clamp so I may have a new one made that incorporates the taper in the bushin in addition to making it a little thinner. This will give me a 15 degree up angle for better alignment with the mixture arm and reduce the complexity. The mixture is a teflon lined straight cable so it needs a secondary attachment to secure it.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.