KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  2-15-2021
Number of Hours:  5.00
Manual Reference:  48
Brief Description:  Work on gear fairings

Well after coming back from a two week ski trip I realized that I had the day off at work so I spent some time working on the gear fairings. I washed down the fiberglass parts as they have been sitting for YEARS collecting dust. I then trimmed the flange to the recommended 3/4" and was able to get the nose wheel fairing clecoed together. I may go with skybolts on thee also but haven't decided yet.

Speaking of Skybolts, I ordered the needed components to switch from hinge to skybolts on the firewall interface. However I had previously installed hinges which means I had to drill out all of those rivets and remove them in preperation for the skybolt flanges.
' style=

Trimmed to 3/4

Trimmed to 3/4"

' style=

Trim line on a fairing

Trim line on a fairing

' style=

Nose wheel fairing clecoed

Nose wheel fairing clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.