Brief Description: Finished up connecting various controls.
I finished up connecting and setting the elevators and control sticks this morning. Everything is looking good. At this rate I will have everything accespt the canopy done before I go to OSH.
Elevator control tube connected to the control stick assembly.
Battery, elevator bellcrank, and pitch servo installed. Need a couple of 3/4" #8 screws to finish up.