KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  7-3-2006
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Ran ands secured part of the main battery runs.

I started to run the battery cables as it will be difficult to get in there once the push pull tubes are in place. Running them up the tunnel should work very well. Once I get past the flap motore and components I will bring the cables up near the top of the tunnel for the remainder of the run. Right now I'm out of DG-8 cushion clamps so I can't run the remaining sections. I am using the cushion clamps where ever it looks like there might be some slack. I also drilled out a rear seat floor pan rivet inside the flap cover space and the one that also secures the seat belt barcket in the floor plan so I can bolt a couple of clamps in those two locations. I need to check around on the weband sewe where everyone is exiting the firewall with their runs.
' style=

View down the tunnel.

View down the tunnel.

' style=

Another overhead view.

Another overhead view.

' style=

View of the aft end, you can see how they are secured.

View of the aft end, you can see how they are secured.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.