KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  6-29-2006
Number of Hours:  2.00
Manual Reference:  38
Brief Description:  Ran the rudder cables

This morning I installed the rudder cables. Not the easiest of things to do when you are a big guy as it requires a lot of work in very tight places. Surprisingly it went some what quickly with no major problems. I also opted to use cable fairings that you can get from Avery or Cleaveland to dress up the exit points. I used a combination of MK-319-BS rivets and my favorite E6000. When I finish the aircraft I will fair it all in with a little bondo.
' style=

Front cable exit.

Front cable exit.

' style=

Aft cable exit

Aft cable exit

' style=

Cable fairing installed..

Cable fairing installed..

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.