KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  5-25-2006
Number of Hours:  2.00
Manual Reference:  34
Brief Description:  Began work on baggage door.

The baggage door goes fairly quickly and I should have it most of the way complete tomorrow. I have a building list of locations that need to be primed/sound dampened and this will be one of those items. I also picked back up a project I stopped a while back when my Dremel quit. I didn't see an easy way to get nut's in place to hold the tail light so i decided to hog out some of the material and fiberglass in a piece of aluminum scrap that could then be drilled and tapped.
' style=

Fitting the baggage door.

Fitting the baggage door.

' style=

Basic structure with hinge attached.

Basic structure with hinge attached.

' style=

Hard to see but there is a piece of aluminum in the bottom of that.

Hard to see but there is a piece of aluminum in the bottom of that.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.