KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  5-10-2006
Number of Hours:  2.00
Manual Reference:  32
Brief Description:  Match/final drilled both halves for joining

Finished up all of the drilling and matching up of components and then seperated the two halves again for final cleanup and prep.
' style=

Everything drilled.

Everything drilled.

' style=

View of the right side.

View of the right side.

' style=

The two halves are seperated for final prep.

The two halves are seperated for final prep.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.