KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
' style=
Date:  1-28-2012
Number of Hours:  25.00
Manual Reference:  
Brief Description:  Much work

I haven't been making regular entries but I have been spending a fair amount of time on the project. I've been primarily working through the panel wiring and so there isn't a lot to report each day. At this point I have the AFS Pilot, PFD, GTX327, D10a, ARINC switch for the autopilot, and the stereo/Sirius interconnect wired up. I also wired the switch for the source selector for the D10a to a 9 pin dsub connector which should make it a bit easier to work on. Right now I'm working on the SL30 which then leaves the GTN650, 496, PS9000, VP200, and misc things. I also found a local source for brass bolts in the larger sizes and I'm replacing the steel through bolt in the firewall for the ground with a brass bolt. I made a forest of tabs that will be connected to it and bolted to the top of the filter box out in the firewall for avionics grounds. I also put the penetrations in for the LSE ignition lines and various sensor wires.
' style=

progress

progress

' style=

new through bolt and ground bus

new through bolt and ground bus

' style=

D10a source select

D10a source select

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.