Drilled holes for conduit and riveted/bolted the ribs to the main spars. I ended up flipping a few of the lower bolts on the left spar because of the additional hole I put in for the AOA tubing. The first inboard three couldn't be flipped because of possible interference with the tank baffles so I left them normal and used some E6000 over the bolt threads as an anti chafe material.