KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  6-2-2008
Number of Hours:  2.00
Manual Reference:  Section 8; Dwg 20
Brief Description:  Installed rivets in bulkhead side channels

I installed all the rivets in the bulkhead side channels that were left open in the quick build kit for a tip-up canopy. Mine will be a slider.
' style=

Installed all rivets in the side braces

Installed all rivets in the side braces

' style=

Drawing of Bulkhead

Drawing of Bulkhead

' style=

Installed all rivets in the side braces installed

Installed all rivets in the side braces installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.