KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  2-3-2007
Number of Hours:  14.00
Manual Reference:  Sec 6; DWG 6
Brief Description:  Finishing the Vertical Stabilizer (steps 14-17)

Steps14-15--Cleco the rib and spar assembly to VS901 skin then rivet the skin starting at the center and working in a T-pattern from the center to prevent oil-canning (both sides) 6.5 hours

Steps 16-17- Cleco on the rear spar assembly and install the remaining rivets. 5 hours

My technical advisor (Clayton Wilhelm) inspected the assembled spar and helped to fix one of the improperly installed hinge rivets. Also provided additional technique and riveting training. 3 hour
' style=

Riveting on the rear spar assembly

Riveting on the rear spar assembly

' style=

Riveting on the internal ribs

Riveting on the internal ribs

' style=

Flush riveting on the skin

Flush riveting on the skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.