KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  1-27-2007
Number of Hours:  12.00
Manual Reference:  Sec 6; DWG 6;
Brief Description:  Building the vertical stabilizer; steps 3-10

Preparing the ribs vs704, 705, 706, 707 (Step 3) fluting and straightening took 2.5 hours. Steps 4-10 took an additional 10.5 hours.

All parts were drilled, deburred, dimpled and countersinked(where applicable) and hinges/rear spar reinforcements installed, drilled, rounded, sanded, and were primed.
' style=

match/drill VS801 to VS-901 Skin

match/drill VS801 to VS-901 Skin

' style=

Entire VS assembly clecoed, dimpled, deburred and drilled

Entire VS assembly clecoed, dimpled, deburred and drilled

' style=

VS ready to prime and rivet

VS ready to prime and rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.