KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  4-14-2007
Number of Hours:  4.50
Manual Reference:  Sec 6; Dwg 4
Brief Description:  Building the Elevators

I cut, drilled, dimpled, and primed all the elevator stiffners for both the right and left elevators. In this photo I have drilled the stiffner holes, dimpled the elevator skin and primed the inside surfaces. I am now preparing to begin riveting the stiffners to the skin.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.