Brief Description: Building the Horizontal Stabilizer Rear Spar Assem
On 2/13/07 I spent 1 hour on steps 1-2 of the rear spar assembly of the Horizontal stabilizer---breaking/rounding/sanding the edges of the HS609 rear spar and the HS603 spar channels
On 2/18/07 I spent 12 hours on steps 3-21 Finishing both the rear and front spar assemblies
Image 1 shows the primed and riveted left elevator hinge brackets on the rear spar assembly Image 2 shows the primed and riveted center elevator bearing on the rear spar assembly Image 3 shows the primed and riveted right elevator hinge brackets on the rear spar assembly