Date: 1-27-2007
|
Number of Hours: 12.00
|
Manual Reference: Sec 6; DWG 6;
|
Brief Description: Building the vertical stabilizer; steps 3-10
|
|
Preparing the ribs vs704, 705, 706, 707 (Step 3) fluting and straightening took 2.5 hours. Steps 4-10 took an additional 10.5 hours.
All parts were drilled, deburred, dimpled and countersinked(where applicable) and hinges/rear spar reinforcements installed, drilled, rounded, sanded, and were primed.
|
|
match/drill VS801 to VS-901 Skin
|
|
Entire VS assembly clecoed, dimpled, deburred and drilled
|
|
VS ready to prime and rivet
|
|
|
|
|
|
|
|
|