KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  8-9-2017
Number of Hours:  4.00
Manual Reference:  DWG C2 Main Wheel
Brief Description:  Installed New Main Gear Tire & Safety Wired Brakes

I received my new tire from VANs and I removed the cut tire from the wheel and installed the new. I installed the brake shoes and safety wired the shoe-bolts. I repositioned my jack and lifted the tail. I was really surprised at how tall the airplane is. It will take some maneuvering once I get the engine and prop installed, but I’m reasonably certain I’ll be able to get the airplane out of my shop through the 8’ high double-car garage doors. These open into another garage where I am currently storing the engine, cowlings, and canopy assembly. The doors that open onto the driveways are as wide and are 10’ tall, so I should not have any problems with these.
' style=

New Tire & Brakes Safety Wired

New Tire & Brakes Safety Wired

' style=

Setting on Gear with tail raised

Setting on Gear with tail raised

' style=

Going to take some maneuvering

Going to take some maneuvering

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.