KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  7-30-2017
Number of Hours:  4.00
Manual Reference:  DWG C2
Brief Description:  More pics of brake and wheels

This is what the wheel and brake assembly in Drawing C2 should have looked like for the left, main gear. After I build up the wheel/tire assembly, I will install the brake hydraulic lines and build the fiberglass fairings. The right side is the same but all the parts are flipped and you have to reverse the brake hydraulic line fitting and the brake bleed fitting so it is on the bottom.
' style=

Aft View looking forward

Aft View looking forward

' style=

Side View

Side View

' style=

Top View

Top View

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.