KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  3-12-2011
Number of Hours:  8.00
Manual Reference:  OP-30
Brief Description:  Fabricate & Install Battery Carrier & Battery

I fabricated the battery carrier and hold-down assembly from scratch. This assembly should hold the battery while inverted pulling 5-8Gs (which is way more than I can take). The 3rd picture shows the master selenoid and the starter selenoid installed on the front of the battery carrier.
' style=

Battery carrier & hold-down

Battery carrier & hold-down

' style=

Battery carrier & hold-down

Battery carrier & hold-down

' style=

Master Selenoid & Starter Selenoid

Master Selenoid & Starter Selenoid

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.