Clamped left and right upper longerons in place. Clecoed in place caps and cockpit rails. Clecoed all gussets in place and clamped longerons to upper motor mount weldments. Final drilled all holes in fwd and mid side skins along with upper, aux, lower longerons. Drilled out #19 holes called out in drawing for screws in lower landing box area.