KitLog pro

Powered By Kitlog Pro v2.0

Michael and Gayle's RV-7A
' style=
Date:  3-24-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Primary wiring - reduex

Well, this has been the month of re-doing work already done. After much deliberation and research I came to the conclusion (based upon Eggenfellner factory recommendations) to redo the Primary wiring from the Z-19/RB architecture to the design layed out in the 2007/2008 E6 Series Installation Guide. A little background. Back in mid-2007, prior to the guide just mentioned being published, the current/best (at that time) architecture was the Z-19/RB. So, I went that route. Now, since there has been much discussion regarding the merits of the E-factory design, I have decided to adopt that architecture and do the re-work now, rather than later. So, spent several hours pulling out wire, clipping off connectors, and basically making a mess. No pictures, not too happy now, but should be later on.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.