KitLog pro

Powered By Kitlog Pro v2.0

Michael and Gayle's RV-7A
' style=
Date:  3-21-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Wiring to tail

Inching ever closer to closing up the tail section with the final skins, I needed to run the wiring to the Magnetometers, the OAT probe, and for future connections for the white tail light and the strobe. To facilitate, I ran plastic conduit through a couple of bays. Fed the wiring and secured the cable ends and connectors.
' style=

A look towards the back with conduit along floor

A look towards the back with conduit along floor

' style=

Connections for the Magnetometers

Connections for the Magnetometers

' style=

Looking down into the tail cone at the OAT probe

Looking down into the tail cone at the OAT probe

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.