KitLog pro

Powered By Kitlog Pro v2.0

Michael and Gayle's RV-7A
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-17-2008
Number of Hours:  8.00
Manual Reference:  
Brief Description:  General wire routing

Fabricated the ground wire between the Engire Ground bus and the Avionics ground bus using 5 x 18AWG wires. Added lots of DG clamps and support for the big wire bundle from the Dynon's and AutoPilot (AP). Ran the remote compass wires for each Dynon down through the fuselage center tunnel. Also ran the AP servo wires along with the Pilot and Co-Pilot PTT lines. Basically working to clean up the upper fuselage area to make wiring easier.
' style=

More cleanup of wires

More cleanup of wires

' style=

Dynon's and AP wire bundle supported through bulkhead

Dynon's and AP wire bundle supported through bulkhead

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.