Powered By Kitlog Pro v2.0
Michael and Gayle's RV-7A
RV-7A
Fuselage
10-30-2006
< Previous Log Entry
Next Log Entry >
Date:
10-30-2006
Number of Hours:
2.00
Manual Reference:
8-10
Brief Description:
F-714 Aft deck
Spent a couple of hours fitting the F-714 aft deck to the longerons to insure there is no twist to the fuselage. Used both a bubble level and a laser level to make sure that with the F-714 clamped in place, the fuselage was level both front an aft.
Using the laser level to verify
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
566
2696
Avionics
13
64
Electrical and Light
32
168
Empennage
85
302
Engine
19
87
Finish
134
768
Fuselage
176
766
Miscellaneous
3
16
Panel
30
150
Propeller
11
75
Service Bulletins
11
54
Shop Supplies
1
Tools
2
Training/Educational
3
8
Wings
46
238
Copyright © 2001-2024 Matronics. All Rights Reserved.