KitLog pro

Powered By Kitlog Pro v2.0

Michael and Gayle's RV-7A
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-10-2009
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Airworthiness Certificate!!

Reached a huge goal today! Designated Airworthiness Representative (DAR), Dan McGeehee from Stockton, CA was at the hanger at 9:30 this morning. After looking over the aircraft and the associated logs and documentation for several hours, he issued the Special Airworthiness Certificate to conduct Phase I flight testing! I think I had goose-bumps for 2 hours after he left :-) Dan was a pleasure to work with, and I really enjoyed hearing about his adventures in Alaska, and in the Navy, and later at the FAA. I spent the rest of the day, at a leisurely pace (on cloud 9 mostly), putting the access panels and interior back together. This plane is ready to fly!! What a day!! :-)
' style=

Dan looking at the wing root

Dan looking at the wing root

' style=

...and taking a look inside

...and taking a look inside

' style=

The big moment!  Congratulations!!

The big moment! Congratulations!!

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.