KitLog pro

Powered By Kitlog Pro v2.0

Michael and Gayle's RV-7A
' style=
Date:  4-15-2009
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Radiator cowling vents

Worked on the right side cutting the baffle material to size and drilling holes, followed by riveting in place. Shifted focus to the Oil Cooler vent and decided to extend the inlet on the cowl rather than try to use rubber baffle material to span a 3" gap. "Tacked" some fiberglass to hold things in position. Tomorrow will finish the glassing on the bench.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.