KitLog pro

Powered By Kitlog Pro v2.0

Michael and Gayle's RV-7A
' style=
Date:  5-10-2008
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Control stick and push tubes

Worked on the Control stick adjustment and installation of the push tubes for the Elevators. It took some time to get things lined up correctly. Attached the Elevator servo also. Began the wiring for the PTT for both sticks and for the Flap control. Managed to get most of the local wiring for the pilot stick complete. No pictures today.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.