KitLog pro

Powered By Kitlog Pro v2.0

Michael and Gayle's RV-7A
' style=
Date:  7-8-2007
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Main and Battery busses wired

Did my first crimping of connectors today. The tools from B & C Specialty worked just fine. The Main and Battery busses are wired up along with the Positive battery cables to each contactor. I had been considering locating the Magnatometers at F-707 but needed to determine if there was any magnetic disturbance from the contactors in that location. To test, I first rotated the outer ring on a compass so the needle pointed direct to North while placed on the outer skin at the top of F-707. Then, I energized both contactors to see if the needle deflected. Yep, about 6 degrees! My plan B was to located the Magnatometers in the tail, so it looks like plan B it is. Hopped around a bit after this and decided to drill the Nose fork. The hole turned out perfectly and is pilot drilled to 1/4. I still have yet to enlarge it to .310, but that will be done after it's drilled to 19/64 in place with the engine mount (pictures of that later).
' style=

Contactor on the right (in this photo) is the Main, and is wired to buss on top

Contactor on the right (in this photo) is the Main, and is wired to buss on top

' style=

Needle centered on North

Needle centered on North

' style=

~6 degrees variance when both contactors engergized

~6 degrees variance when both contactors engergized

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.