Deburred the forward covers and tested for fit. Deburred the fuel valve cover and installed the nutplates to the supporting structures. Pretty simple structures. The Andair six port fuel valve for the Eggenfellner engine will ship with the engine in a few months time. Not much else to do in this area at this point. Moving on to the electric flap assembly.