Powered By Kitlog Pro v2.0
MURRAY'S WEB SITE
Spitfire Mk 26
Engine
5-16-2016
< Previous Log Entry
Next Log Entry >
Date:
5-16-2016
Number of Hours:
10.00
Manual Reference:
Brief Description:
Attempt engine start
Fitted fuel tank and made up lines. Put 20 litres of BP 98 in thank.
Attempted engine start. No success. Good fuel pressure. Removed fuel tank and checked fittings. Found one leaking at fuel drain.
Fill brake lines and bleed. Installed audio plugs and control stick.
Finalised flap rigging. Connected fuel pressure sender.
Fitted fresh are ducts and engine ductiong system.
Installed diode, (3 amp, 400 v) on AAA, BBB and CCC.
Fitted transponder coax and VHF coax.
Attached air box and air filter.
Fitted split pins on main wheels.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Spitfire mk 26 Home
Spitfire Mk 26 Home
Category
# Logs
# Hours
All
348
1681
Avionics
10
50
Electrical
7
70
Empennage
19
152
Engine
24
110
Equipment
5
12
Fuselage
242
1008
Insurance
1
5
Miscellaneous
11
65
None
5
22
Preparations
6
28
Tools
1
1
Wings
17
158
Copyright © 2001-2024 Matronics. All Rights Reserved.