KitLog pro

Powered By Kitlog Pro v2.0

Mike & Aneta's RV Projects
' style=
Date:  8-24-2011
Number of Hours:  2.00
Manual Reference:  VS Section 6(4)
Brief Description:  First Rivet! (For the 2nd Time)

Tonight I replaced the part in my pneumatic squeezer and began riveting together the vertical stabilizer parts (second batch of parts). I am anxious to get the VS spar together. As previously posted, I had to replace all parts of the vertical stabilizer spar because I damaged the skin with my bent pneumatic squeezer. When I get all the new parts assembled and riveted together, I'll feel like I'm back where I was several weeks ago. From there, I think all future progress will feel more substantial. Below is a picture of the "First Rivet," for the second time around. I couldn't resist signing it like I did with the first one.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.