KitLog pro

Powered By Kitlog Pro v2.0

Mike & Aneta's RV Projects
' style=
Date:  5-3-2017
Number of Hours:  2.00
Manual Reference:  F-Section(32)3-4
Brief Description:  Match-drilling the Two Fuse Halves

Tonight, I match-drilled the longerons that overlap where the two halves of the fuselage come together. I also deburred them, then installed the hardware needed to bolt them together, temporarily, during match-drilling.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.