KitLog pro

Powered By Kitlog Pro v2.0

Mike & Aneta's RV Projects
' style=
Date:  2-19-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Technical Counselor Inspection

Tonight, I was visited by two of my local EAA Chapter's Technical Counselors, Ted Lemen and John Linz. The two of them inspected all the work I've done so far on the project and wrote out a formal report, which will go to EAA National, for record. It's great to have these inspections periodically throughout the build. I have felt pretty comfortable with my work, thus far, since there is so much information on how to do the job properly. However, later, when I get to the rigging, engine, prop, etc., these inspections by EAA Technical Counselors will be invaluable.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.