KitLog pro

Powered By Kitlog Pro v2.0

Mike & Aneta's RV Projects
' style=
Date:  6-17-2012
Number of Hours:  10.00
Manual Reference:  W-Section(13)2-3
Brief Description:  Match-drilling Right Stiffeners & Countersinking

Today was my first Father's Day, as a father. Aneta was kind enough to let me work on the plane all day, while she took care of Amelia. She also got me an RV-10 mug, shirt and a really cool drawing at the Denver Art Expo. It's sort of a comical portrayal of me flying an RV-10 through extreme turbulence, with everything going haywire. Parts are falling off the plane, control surfaces are twisting, and the pilot (me) and passenger (Aneta) have left imprints of their skulls in the metal roof. Hopefully this is not foreshadowing. The workday was very productive, although somewhat tedious. I finished match-drilling the right wing stiffeners, and began countersinking the holes in the spar to receive rivets later. Lots, and lots, and lots of holes to be drilled, re-drilled and countersunk... UGH! :)
' style=

Right Spar Stiffeners Complete!

Right Spar Stiffeners Complete!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.