KitLog pro

Powered By Kitlog Pro v2.0

MIKE'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-24-2004
Number of Hours:  20.00
Manual Reference:  
Brief Description:  Redo Electrical system

Combined several weeks work Decided to re-do Vans electrical system to fuse type system of Bob Nuckolls Removed old sw/cb, buss bars, and CB Redigned and drew schematics - New systems will have central ground block on FW, Main Fuse block, switchable essential fuse block and battery FB and later, LP3 ALT Controller Installed 24 pos ground block on FW and connected all grounds for lites/strobes and electrical system so far Drilled and installed new switches
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.