KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  6-27-2012
Number of Hours:  1.00
Manual Reference:  C01
Brief Description:  Control bungee + hinge cotters

- Made the bungee that holds the elevator at or below neutral (photos 1 &2). This completed Sheet C01, except for the control rigging, which won't happen until we're almost ready to fly.

- Installed the first cotter pin to hold the flap hinge pin in place. I snapped the end of the 3/64" drill bit, so I only got one done.
' style=

Bungee with Plasti-grip ends drying.

Bungee with Plasti-grip ends drying.

' style=

Control bungee installed

Control bungee installed

' style=

First flap hinge cotter pin installed.

First flap hinge cotter pin installed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.