KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  11-30-2011
Number of Hours:  3.00
Manual Reference:  C07
Brief Description:  Forward fuselage floor structure

- Installed 6 nut plates, to which the pushrod cover will attach (photo #1)

- Finished pilot drilling and then updrilling all the holes for all of the channels that make up this structure.

- Next will be to debur and finall get to some riveting! (Although the bottom/floor skin will remain cleco'd only, allowing access to the cockpit from below, all the way until the day before the aircraft gets its final inspection).
' style=

Nut plates installed for cover (cover at upper left)

Nut plates installed for cover (cover at upper left)

' style=

All parts finally located and updrilled

All parts finally located and updrilled

' style=

All holes for floor structure done and updrilled

All holes for floor structure done and updrilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.