Fuselage
11-22-2011
< Previous Log Entry
Next Log Entry >
Date:
11-22-2011
Number of Hours:
0.00
Manual Reference:
F11
Brief Description:
Finish F11 of forward fuselage
See the previous page (same date) for more description.
- Photo #1 shows the lower and upper firewalls both in place
- Photos #2 & #3 show the forward part of the spar tunnel installed with flush rivets.
The two fuselages are now forever as one...
I hit the 1,400 hour mark tonight.
Upper and lower firewalls
Forward spar tunnel riveted in place (blue tape a reminder not to rivet)
From inside the spar tunnel, showing the flush rivets.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Sonex Standard Gear Home
Category
# Logs
# Hours
All
1608
2445
Aluminum Materials
45
98
Angle Parts
63
126
Avionics
96
132
Bending Brake
10
15
Canopy
61
91
Controls
55
85
Cowl
84
99
Empennage
100
179
Engine
224
233
Finish-Polish
66
85
FLIGHT!
18
Fuel System
36
43
Fuselage
208
382
Hardware
3
4
Landing Gear
74
95
Learning Point
2
1
Miscellaneous
84
111
None
7
Prop
6
7
Smoke System
7
6
Tools
5
9
Upholstery
7
6
Wings
347
638
Copyright © 2001-2024 Matronics. All Rights Reserved.